Road Project Management
(0)
Engineering and Technical
This training is designed for those who would be anticipated
This training is designed for those who would be anticipated
Permeable interlocking concrete pavement, also referred to as PICP, consists of solid concrete paving units with joints that create openings in the pavement surface when assembled into a pattern. The joints are filled with permeable aggregates that allow water to freely enter the surface.
Course Outline (Topics)
Course Duration
2 days
Contact us for a quote or in case of any urgent queries please send us an email on: info@orientmct.com
we will get back to you right away!