OrientMCT

Road Project Management

(0)
Engineering and Technical

 This training is designed for those who would be anticipated 

OrientMCT
Road Project Management

Permeable interlocking concrete pavement, also referred to as PICP, consists of solid concrete paving units with joints that create openings in the pavement surface when assembled into a pattern. The joints are filled with permeable aggregates that allow water to freely enter the surface.

Course Outline (Topics)

  • Mechanistic-empirical pavement structural design 
  • Project suitability 
  • Structural and hydrologic design
  • Key design considerations 
  • Water quality benefits 
  • Construction steps 
  • Maintenance guidelines

Course Duration

2 days 

Get In Touch!

Contact us for a quote or in case of any urgent queries please send us an email on: info@orientmct.com
we will get back to you right away!

7th Floor - Al Otaiba Tower